![]()
![]()
Estimating the overall cost for a project, while bidding, in a engineering company has always been a experience based procedure, depending mainly on the capability and experience of the marketing executive. This has proved to be unstable method of arriving at the cost of a project and directly affects the profitability of the company.
Estimation and Tendering software (ETS) addresses this inadequacy and helps the marketing department of the company in calculating the overall cost of the project in a very methodical and accurate manner.
ETS, in close integration with SPEED,
leverages the master data library generated by the engineering department
and gives the ability of selecting the nearest possible combination already
engineered. This brings in a tremendous amount of accuracy to the data required
by the marketing engineer to estimate a project's cost
in a much more accurate way.
| Modules | |
| —————————— | |
| PanelBase | |
| -------------------------- | |
| SPEED Configuration | |
| -------------------------- | |
| SPEED | |
| -------------------------- | |
| SPEED BOM | |
| -------------------------- | |
| Estimation & Tendering | |
| —————————— | |
| Highlights | |
| |
|
| » |
Leverages the vast data present in knowledge server generated by engineering department. |
| » |
Transparent access to technical parameters for better estimation. |
| » |
Uses the latest purchase price for all items selected |
| » |
Automatic and accurate optimization algorithm for placement of MCC modules in minimum number of panels for modular panels. |
| » |
Highly flexible and interactive module/panel relocation for modular panels. |
| » |
Highly flexible and interactive module/panel relocation with editing facility for modular panels. |
» |
Fully automatic and exhaustive report generation |
» |
Ability to generate reports in different currencies |
» |
Maintains report wise revisions for backtracking changes |
| Outputs | |
| » |
Switchboard wise pricing details and schedule |
| » |
Total price of panels and feeders |
| » |
Total summary of components |
| » |
Project's spare list with and without price |
| » | Feeder wise bill of materials |
| » | Switchboard to feeder chart |
| » | Technical specifications |
| » | Unit price of panels and feeders |
| » | And more... |


ETS screen shot

Better
solutions for the engineering industry |
(c)
DeltaCADD Solutions, 2004 |